Published: 16 January 2017
Approximately 15 metres of concrete on driveway needs to be replaced - is in two parallel sections with grass in between section. Each section is roughly .9M wide. Replacement concrete needs to be matched up to existing concrete as closely as possible. Work needs to be completed first week February.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 |
|
159 jobs | No longer in contact |
#3 | Tradie 3 |
|
121 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 22 jobs | No longer in contact |
#5 | Tradie 5 |
|
66 jobs | No longer in contact |
Partner with Builderscrack
Get work