Published: 16 November 2011
To remove and replace paving to a minimum of 150mm below floor level . Remove stones and lower ground level 225mm below floor level. Lower cess-pit lid level as required
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 207 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 15 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 11 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 11 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 23 jobs | No longer in contact |
Partner with Builderscrack
Get work