Published: 15 August 2016
Driveway drainage channel upgrade - Scope of works: *Cut concrete and excavate to 100mm below existing concrete drainage channel, at least 160mm wide. *Disposal of soil. *Install 150mm wide channel drain and concrete into place
#1 | Tradie 1 |
|
62 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 13 jobs | No longer in contact |
#3 | Tradie 3 |
|
66 jobs | No longer in contact |
Partner with Builderscrack
Get work