Published: 11 April 2016
Remove and replace approximately 6 square metres of asphalt. A join already exists between the area to be repaired and the area that will remain. Minor shoring up works to prevent same problem happening again are required.
#1 | Tradie 1 | No recent reviews | 148 jobs | No longer in contact |
Partner with Builderscrack
Get work