Active job

Piles for a new deck.

Job image
Job image

Job description

Decking & Pergolas
Selwyn

Published: 17 March 2018

I need some piles put in the ground for 2 decks. As per photos, one deck will need 28 piles and the other deck will need 10 piles. The work will involve digging of the holes and concrete new piles in. Piles will need to be --- . The holes will need to be at least 500mm with the piles sitting on at least on 100mm of concrete. Altogether, there's approx 30 holes that has been half dug to about 300mm deep. The back yard can be accessed through a 2.5m fence panel that can be removed. Please include all material cost. - piles and concrete.


Trade professionals

#1 Tradie 1
30 jobs No longer in contact
#2 Tradie 2
18 jobs No longer in contact
#3 Tradie 3 No recent reviews 9 jobs No longer in contact
#4 Tradie 4 No recent reviews 18 jobs No longer in contact
#5 Tradie 5
51 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo