Published: 17 March 2018
I need some piles put in the ground for 2 decks. As per photos, one deck will need 28 piles and the other deck will need 10 piles. The work will involve digging of the holes and concrete new piles in. Piles will need to be --- . The holes will need to be at least 500mm with the piles sitting on at least on 100mm of concrete. Altogether, there's approx 30 holes that has been half dug to about 300mm deep. The back yard can be accessed through a 2.5m fence panel that can be removed. Please include all material cost. - piles and concrete.