Published: 7 August 2015
The floor boards in the bathroom below the vinyl seem to have had it. The moisture in the bathroom have softened these boards. Need to repair the boards and then re-lay the vinyl please. Please note that the job needs to be done asap, but within a week. Thank you
#1 | Tradie 1 |
|
151 jobs | No longer in contact |
#2 | Tradie 2 |
|
26 jobs | No longer in contact |
#3 | Tradie 3 |
|
220 jobs | No longer in contact |
#4 | Tradie 4 |
|
33 jobs | No longer in contact |
Partner with Builderscrack
Get work