Published: 28 May 2023
Temporarily remove front entrance door. Remove and replace old timber base plate (sill?). Remove and replace inside and outside wall coverings. Repair and screed concrete base. Re hang door and ensure all straight. No painting required It’s a shared entrance so aim to complete in one day.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 14-06-2023
#1 | Tradie 1 |
|
44 jobs | Secured job |
#2 | Tradie 2 |
|
53 jobs | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
#4 | Tradie 4 |
|
12 jobs | No longer in contact |
#5 | Tradie 5 |
|
114 jobs | No longer in contact |
Partner with Builderscrack
Get work