Published: 14 March 2023
Remove stainless steel sink bench and install new stainless steel sin bench (sink bench supplied). Fix kitchen cupboard door. Install kitchen splashback (splashback provided). Repair 3 X small sections of flooring: cut out chip board and patch. Flooring supplied. Cut hole in bathroom ceiling for dryer vent (ducting already installed). Build steps from ranch slider to courtyard (two steps). Repair damaged cedar cladding.
#1 | Tradie 1 |
|
9 jobs | No longer in contact |
#2 | Tradie 2 |
|
40 jobs | No longer in contact |
#3 | Tradie 3 |
|
43 jobs | No longer in contact |
Partner with Builderscrack
Get work