Published: 22 May 2021
We are currently replacing the roof. The existing decramastic apron flashing has been removed along with all roof tiles. Following the new ColorSteel roof installation, a new metal apron flashing has to be inserted behind the direct fixed weatherboards (supplied by the roofer), which will require cutting of the existing boards and replacement after the flashing is fixed. We will require this work be carried out along with the roofer on May 27th (Thursday).
#1 | Tradie 1 |
|
73 jobs | No longer in contact |
#2 | Tradie 2 |
|
332 jobs | No longer in contact |
Partner with Builderscrack
Get work