Published: 20 May 2021
Existing deck needs to be replaced 2 parts: Deck Removal Works Remove full deck structure Including decking, joists, handrail, post and bearers approximately 7m2. Main Deck Works Build new handrail to match existing, 1.6m long to finish the deck Uplift decking on the main central part of deck (6m x 4.8m) Run new joists as needed so decking runs all the same way Re-lay new 32mm x 90mm premium pine decking screwed down with stainless steel screws
#1 | Tradie 1 | No recent reviews | 12 jobs | No longer in contact |
#2 | Tradie 2 |
|
162 jobs | No longer in contact |
#3 | Tradie 3 |
|
73 jobs | No longer in contact |
#4 | Tradie 4 |
|
33 jobs | No longer in contact |
#5 | Tradie 5 |
|
196 jobs | No longer in contact |
#6 | Tradie 6 |
|
24 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 20 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 11 jobs | No longer in contact |
Partner with Builderscrack
Get work