Active job

Toilet Wall and Frame repair

Job image
Job image
Job image

Job description

House Repair & Maintenance
Auckland

Published: 13 November 2020

We require a build to work along side our plumber to replace our urinals with new stainless steel ones. Carpentry work required after the plumber has disconnected the urinals: Remove partitions between, and at end of urinals to allow for repairs to be undertaken. Remove seratone wall linings to allow for removal and replacement of rotten timber framing and bottom plates. Carpenter to confirm full extent of framing replacement once seratone is removed. Remove and replace if required any framing (bottom plate, and plate further up), including vertical framing of rotten areas. Replace seratone linings and associated jointers covering the service duct beneath urinals and to wall as required. Silicone existing internal joins with mold resistant bathroom silicone and any waterproofing required. Reinstate all partitions as required.


Trade professionals

#1 Tradie 1
162 jobs No longer in contact
#2 Tradie 2 No recent reviews 24 jobs No longer in contact
#3 Tradie 3 No recent reviews 2 jobs No longer in contact
#4 Tradie 4
332 jobs No longer in contact
#5 Tradie 5 No recent reviews 11 jobs No longer in contact
#6 Tradie 6 No recent reviews 3 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo