Published: 18 January 2014
Remove timber frame window sash etc completely and dispose of. Window hardware to be retained. Frame wall and fix building paper Replace and match exterior cladding (weather board), prime and top coat. Install supplied insulation. Gib line and stop internal for paint finish. Existing window 2400 x 1200mm. Secure temporary weather protection required during works.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very good to deal with. Have recommended Mike and will again.
Work carried out by the owner/operator
Reviewed on 21-07-2014
Tradesperson reply
"Thanks for your top review. See you soon, Regards, Mike"
Partner with Builderscrack
Get work