Published: 1 March 2019
PRIORITY 1. 1. TAR-SEAL ENTRANCE WAS OF TOP GATE – PREFERABLY CONCRETE PRIORITY 2. 1. SAND , VANISH & PAINT RAMPS, RAILS, VISITORS AREA, CARPORT,PORCH FRONT OF MEETING HOUSE, WALLS IN FRONT OF MEETING HOUSE INCLUDING WHITE PAINT DOORWAY, SEATING TRIPOLI SIDE, BACK OF MAIN BUILDING, STEPS – RAIL 2. REMOVE STEEP RAMP – REPLACE TRIPOLI SIDE 3. RE-BUILD RAMP – STORAGE GARAGE AND IN FRONT OF ROLLER DOORS SPECIAL NOTE: WOULD LIKE ALL WORK COMPLETED ON THE OUTSIDE FIRST PRIORITY 3. 1. DINING ROOM & KITCHEN: NEW FLOORING, SKIRTING & PAINTING 2. SOME TYPE OF SHUTTER (KŌHANGA REO) SEPARATE 3. IF POSSIBLE OPEN UP KITCHEN DOOR WHERE DUMBWAITER IS! HAVE SALOON TYPE DOORS 4. NEW BENCH TOPS (STAINLESS STEAL) PREFERABLY RINSING SINK DEEP & WASHING SINK IN THAT ORDER WITH SPRAY TAP 5. REMOVE HEAVY STAINLESS STEEL SHELF – CONSTRUCT AN OPEN PANTRY, IF POSSIBLE BENCH TOPS. LIKE THE EXISTING SHELF WE HAVE FOR PLATES/CUPS ETC – WILL BECOME A SERVING BAY PRIORITY 4. 1. COVER UP SHELVING IN HALLWAY SO THAT IT’S A WALL 2. ENTRY THRU THE HALLWAY MAKE A DOOR FROM MEETING 3. SKIRTING AND PAINTING IN THE MEETING HOUSE PRIORITY 5. INVESTIGATE THE BEST WAY TO ADD AN ADDITIONAL 2 SHOWERS TO THE LADIES BATHROOM PRIORITY 6. INVESTIGATE BEST OPTION FOR LAUNDRY ROOM PRIORITY 7. CEILING DOWNSTAIRS – COVER UP HOLES PRIORITY 8. LATCH FOR CHILDREN’S SAFETY GATE Would like quote as soon as possible, as we are applying for funding from Auckland Council - Marae Development Cultural Initiatives Fund. Quote required on 15th March 2019.
#1 | Tradie 1 |
|
162 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 57 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 7 jobs | No longer in contact |
Partner with Builderscrack
Get work