Published: 6 April 2018
Removal of existing decking timber and replacing with new hardwood. The substrate is sound. Total area to be replaced is 39sq metres. Also 10 steps 1.2m wide need to be replaced.
#1 | Tradie 1 |
|
230 jobs | No longer in contact |
#2 | Tradie 2 |
|
20 jobs | No longer in contact |
#3 | Tradie 3 |
|
220 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 14 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 25 jobs | No longer in contact |
Partner with Builderscrack
Get work