Review

Deck Steps

Job image
Job image
Job image

Job description

Decking Restoration & Repair
Auckland

Published: 3 April 2016

There is a unprotected end of the deck with a 650mm drop off to another smaller deck. I want to put in triangular shaped steps to link the 2 decks and a suitable handrail. Also under the deck there is an approx 1.5m section of cement type board broken off that needs to be placed. Work to be done in the 1st week of May (2nd - 6th May).


Review

Workmanship
4.0
Cost
5.0
Schedule
5.0
Communications
5.0

Great communication and job done exactly when scheduled with no issues and at a good price. Very pleased with the job. Thanks

Reviewed on 25-05-2016

Tradesperson reply
"Thank you for the review"

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 98 jobs Secured job
#2 Tradie 2
333 jobs No longer in contact
#3 Tradie 3 No recent reviews 26 jobs No longer in contact
#4 Tradie 4 No recent reviews 7 jobs No longer in contact
#5 Tradie 5 No recent reviews 147 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo