Published: 15 January 2014
Requirement is for the replacement of the main entrance door to our building. Includes removal of existing door and fitting of new door, which we have already purchased, making good trims and finish to existing standard. The new door is 200mm taller and will need to be located approx 150mm further to the left than the current door so changes to the framing will be required to fit it and replacement of trims etc. The internal structure is gib, external is hardy board.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 12-02-2014
Tradesperson reply
"Thanks for your great feedback. Got the required results. Thanks. Mike"
Partner with Builderscrack
Get work