Published: 12 April 2018
I need to create a manhole at least 50x50cm, as the current manhole is obstructed by beams. Needs to be completed so that it's left in a tidy state for future - e.g. frame, with lift-up panel.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Got the job done reliably and as required!
Work carried out by the owner/operator
Reviewed on 30-04-2018
Tradesperson reply
"Thanks for your feedback. Good results"
Partner with Builderscrack
Get work