Active job

concrete slabs

Job image

Job description

General Building
North Shore

Published: 20 April 2010

We need 3 small concrete slabs for a carport and patio area to be placed and screeded. The total area is about 34 square meters of slab, plus edgebeams and 8 minipiles, I calculate it all to need about 7 cubic meters of concrete. The formwork and steel is now in place and it is ready for the concrete to be poured as soon as possible.


Trade professionals

#1 Tradie 1 No recent reviews 6 jobs No longer in contact
#2 Tradie 2 No recent reviews 10 jobs No longer in contact
#3 Tradie 3 No recent reviews 2 jobs No longer in contact
#4 Tradie 4 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo