We have a first floor window frame complete approx 1900 wide to be replaced as it is rotten. We have the replacement window. Job must be done between 20 April and 23 April as the unit will be unoccupied during that period.
#1 | Tradie 1 |
|
29 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
45 jobs | No longer in contact |
#4 | Tradie 4 |
|
13 jobs | No longer in contact |
#5 | Tradie 5 |
|
26 jobs | No longer in contact |
#6 | Tradie 6 |
|
18 jobs | No longer in contact |
#7 | Tradie 7 |
|
40 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work