We have a design brief from CGW engineers, and need to have some steel brackets bolted to the tilt-slab concrete walls & midfloor in specific locations in our commercial warehouse to bring it up to 67% building code. The brackets & bolts will be supplied. Will need PS4 at end of job. Timeframe by end April
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job thanks team :-)
Work carried out by the owner/operator
Reviewed on 14-08-2022
Partner with Builderscrack
Get work