Published: 30 March 2022
We have a design brief from CGW engineers, and need to have some steel brackets bolted to the tilt-slab concrete walls & midfloor in specific locations in our commercial warehouse to bring it up to 67% building code. The brackets & bolts will be supplied. Will need PS4 at end of job. Timeframe by end April
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job thanks team :-)
Work carried out by the owner/operator
Reviewed on 14-08-2022
#1 | Tradie 1 |
|
1 job | Secured job |
#2 | Tradie 2 |
|
44 jobs | No longer in contact |
#3 | Tradie 3 |
|
46 jobs | No longer in contact |
#4 | Tradie 4 |
|
42 jobs | No longer in contact |
#5 | Tradie 5 |
|
67 jobs | No longer in contact |
Partner with Builderscrack
Get work