Published: 19 July 2020
I dont know what the name of the board that I required is called, my house is on piles and I am needing a board placed to make one side of the house "finished" off. The board is approximately 6m long, and will need to be customised to go over the drains (see photo 1), the second photo shows how I would like it to look.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Russell knew what needed to be done and it was done without any issues, he discussed throughout the job and asked my thoughts. I congratulate Russell for supporting an apprentice who will be a fully qualified competent builder soon.
Work carried out by the owner/operator
Reviewed on 09-08-2020
Tradesperson reply
"Than you Liz. You were a pleasure to work for.
Cheers"
Partner with Builderscrack
Get work