Posted 1 year ago
Driveway Entrance Pillars
Blockwork
Prebbleton, Selwyn
Erect 6 concrete block columns 800mm sq x 2000mm high, concrete pad already down with vertical steel rods inserted, I have cabling that needs to come through the block work for lights and what not so will help get that sorted, timeline would be nice to have done in the next 2 or 3 weeks if possible can discuss, then I will need to get them plastered
I have some blocks but will talk with the tradesmen on what type