Erect 6 concrete block columns 800mm sq x 2000mm high, concrete pad already down with vertical steel rods inserted, I have cabling that needs to come through the block work for lights and what not so will help get that sorted, timeline would be nice to have done in the next 2 or 3 weeks if possible can discuss, then I will need to get them plastered I have some blocks but will talk with the tradesmen on what type
#1 | Tradie 1 |
|
317 jobs | No longer in contact |
#2 | Tradie 2 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work