Posted 3 years ago
Full bathroom renovation
Bathroom Renovation
Karori, Wellington
Bathroom
(W)1700mm x (L)2680mm x (H)2450mm
Bath
(L)1650mm x (W)720mm
The cupboard and heater on the left-hand side should go, but everything else should be replaced. The lino should come up, vanity out, bath removed, shower enclosure removed, and all replaced. Ceiling ventilation needs to be installed above the shower to meet healthy homes standards (and electrical safety).
Job includes:
- removing lino and old things
- painting walls, ceiling, trim (let's assume white with navy tri...