Completed light commercial fit out of existing building. Light demo required to remove existing framing, remove concrete tiles from the entry and exterior, cut channel into concrete floor for power points. Installed new ceiling and wall plasterboard. Built new window and door frames, and installed new windows and entry doors. Created external flower beds from existing concrete structure. Prepped and painted both the interior and exterior of the building.
Last updated on 02-07-2024
Partner with Builderscrack
Get work