This project is the second bathroom in this house that Gravity Projects has completed. On this project, the existing bathroom was completely stripped back to bare framing and concrete floor then rebuilt.
There were a few challenges on this project like walls not being straight & true & a very high external sewer connection. We overcame all the challenges through careful height calculations and thorough craftsmanship.
We added some great details that really make the bathroom a statement piece like making the shower plinth a feature instead of trying to disguise it, adding additional linings behind the acrylic shower liner so it finishes flush with the face of the tiles, & returning the wall tiling into the window.
Last updated on 04-04-2024
Partner with Builderscrack
Get work