Project

Swale drain

First load of sludge dug out and tipped on site
First load of sludge dug out and tipped on site
All sludge loaded out and establishing new falls
All sludge loaded out and establishing new falls
Correct fall dug in and edges straightened up. Filling in eroded areas
Correct fall dug in and edges straightened up. Filling in eroded areas
Weed mat laid and pinned down and gabion rock put in
Weed mat laid and pinned down and gabion rock put in

Project description

Client wanted to tidy up eroding drain and straighten up the edges. Before hand the drain was high maintenance with plants growing out of it and constantly blocking colvert pipe due to lack of fall.
Drain was dug out, weed mat laid and gabion rock put in. The 3t tipper and little 1.7t digger were a perfect combo to move material around plants and tight access way causing minimal disturbance to the property.

Last updated on 13-02-2024