Project

Flooring & Stairs

Removal of Carpet
Removal of Carpet
Checking Subfloor to ensure manufacturers guidelines are met
Checking Subfloor to ensure manufacturers guidelines are met
Grinding as much of the humps out as possible ready to add primer for self leveling compound
Grinding as much of the humps out as possible ready to add primer for self leveling compound
Adding levelling compound to remove the large dip in the room
Adding levelling compound to remove the large dip in the room
Finally we lay the floor :)
Finally we lay the floor :)
I think he approves 😀
I think he approves 😀

Project description

Replaced old carpet with new SPC Flooring. Sup floor needed some preparation to ensure the floor would last. Fantastic Result and the Client was very happy with the results.

Last updated on 29-01-2024