Project

Electrical Renovation / Updating

Project description

1959 House build

- Switchboard Upgrade and Partial Re-Wire
- Replaced Existing Switchboard Enclosure and MCB breakers (Non-compliant) and added Full RCBO protection to all Lights and Power circuits
- Replaced all non-compliant wiring
- Replaced all old style Trigger Switches powerpoints
- Replaced all old style Triggle Switches light switches
- Replaced all old light fittings to LED
- Installed 5kw Haier heat pump
- Installed 3x PIR security alarm system
- Installed new extraction fan, bathroom heater and heated towel rail
- Added powerpoint for toilet
- Added 2x powerpoint per bedroom
- Relocated TV aerial to a more user friendly area in the lounge

No holes made on the wall :). We’re not plasterers afterall.

CoV, CoC/ESC issued. House is now up and running.

Last updated on 30-12-2023