Project

Alteration exterior cladding

Asbestos cladding

Asbestos cladding

Asbestos cladding

Asbestos cladding

Rotten exterior framing

Rotten exterior framing

New framing installed

New framing installed

Earthwool insulation install

Earthwool insulation install

Building wrap installed

Building wrap installed

Cavity system installed

Cavity system installed

Weatherboard cladding install

Weatherboard cladding install

Weatherboard cladding install

Weatherboard cladding install

Completed ready to paint

Completed ready to paint

Completed ready for paint

Completed ready for paint

Project description

In this project our clients were sick of the sight of their bottom storey floor and wanted an updated look to match the top storey weatherboards.

The original cladding being asbestos we had organised a specialised subcontractor to demo and takeaway the old cladding.

Once opened up we ran into a lot of rot in the external framing to which we replaced everything that was needed including two new double glazed windows.

We then wrapped the building in building paper, added in a cavity system allowing the building to breathe a lot better.

Finished off with a new weatherboard look with facings to windows and doors scribers cut in and all sealed watertight.

Please see photos for references.

Last updated on 23-11-2023