Project

Geotechnocal Assessment

Report

Report

Project description

This report outlines the recommendations for the failed concrete crib wall at 49 Collingwood Street.
No geotechnical investigation has been conducted while this report has been prepared.
The significant settlement observed behind the crib wall indicates that the ground in a substantial portion of the yard has experienced failure.
We hold the belief that there is no viable remediation option for the existing retaining wall, and it is recommended that a new retaining wall be designed against the slope.

Last updated on 22-09-2023