Project

Weymouth

Exsiting soil stack to be lifted up and AV valve to be installed
Exsiting soil stack to be lifted up and AV valve to be installed
Exsiting pan connector restricting flow
Exsiting pan connector restricting flow
Stack lifted and AV valve added
Stack lifted and AV valve added
New install waste altered and lifted to sute outlet of pan
New install waste altered and lifted to sute outlet of pan
Waste pipe for toilet lifted to correct height and ucon pan connector installed
Waste pipe for toilet lifted to correct height and ucon pan connector installed

Project description

Onwer complaining that Toilet had been blocking constantly.
This was due to the offset in the pan connector.

Last updated on 15-12-2022