Project

Front mounted wall

During
During
After
After
Keeping access to the water meter
Keeping access to the water meter
After
After

Project description

Running 40m alongside an existing driveway. Built to replace a failing wall and conserve valuable driveway space.

Last updated on 25-04-2022