A jungle that needed taming with low grass over grown trees and bushes, 1m+ deep holes and tomos from water scouring out the land and an overland flow path that needed abit of TLC we managed to chase all tomos down back filled and compacted clay back in, reshaped with losing the natural contours scalloped out a path for the water to follow and it ran 100% of the time layed some geo mat down with gabion to slow water and connected downpipes up and ran back to overland flow path with concrete riprap at outlet to stop future scouring