Scope of works:
- Full 2 level strip-out + floor grind
- Make new openings for internal staircases in structural block wall
- Work with CRC to recycle/repurpose and reuse as much of the waste and redundant items as possible.
Last updated on 13-09-2026
Partner with Builderscrack
Get work