Existing bathroom was in need of more space and a reconfiguration, out with the old shower and vanity, in with new.
Hallway cupboard sunk into bathroom from other side eating into room size, so this was removed and made way for install of a Cavity slider achieving larger entry size to room.
Bathroom fully re lined with Aqualine Gib, and finished accordingly.
liaising with other subtrades achieved the right location of services needed to complete the fit out.
Last updated on 19-05-2026
Partner with Builderscrack
Get work