Project

Retaining wall

The site at the beginning, starting with the string line
The site at the beginning, starting with the string line
Holes dug, posts in, concrete mixed and poured. Excess dirt stored to the side for redistribution afterwards
Holes dug, posts in, concrete mixed and poured. Excess dirt stored to the side for redistribution afterwards
Full wall line - 18 posts across various levels
Full wall line - 18 posts across various levels
Boards going on, with trench behind for the drainage elements
Boards going on, with trench behind for the drainage elements
Initial boards on to secure horizontal levels, and dirt redistributed
Initial boards on to secure horizontal levels, and dirt redistributed
Tidy up to leave for a month while clients saved up funds for the rest of the project
Tidy up to leave for a month while clients saved up funds for the rest of the project
Felt cloth laid to protect drainage pipe from sediment
Felt cloth laid to protect drainage pipe from sediment
Drainage pipe, wrapped in second layer of cloth, positioned behind the wall on top of porous gravel
Drainage pipe, wrapped in second layer of cloth, positioned behind the wall on top of porous gravel

Project description

A young family in their recently built home on a very steep coastal site needed a retaining wall built between their property and their neighbour down the hill. A challenging job given the limited access up a long, steep stairway, requiring all materials to be carried up by hand. Job is currently on hold while client saves funds to complete it.

Last updated on 30-04-2026