Camborne New Builds

Before earthworks began.
Before earthworks began.
Earthworks complete, complex foundations, piles and retaining all coming together.
Earthworks complete, complex foundations, piles and retaining all coming together.
A fresh ground level slab. After the block work come the frames.
A fresh ground level slab. After the block work come the frames.
Foundations and floors complete, now for the frames.
Foundations and floors complete, now for the frames.
Next comes the roof.
Next comes the roof.
Large timber framed floor.
Large timber framed floor.
Next thing you know the roof is on. We do all our own roofing.
Next thing you know the roof is on. We do all our own roofing.
Low pitch skylight installed
Low pitch skylight installed
A view from the other side of the section before earthworks began.
A view from the other side of the section before earthworks began.
You can see the whole site is being utilised for the build.
You can see the whole site is being utilised for the build.
Just enough space left for a lawn.
Just enough space left for a lawn.
Spacious open plan living.
Spacious open plan living.
A good size deck with a spectacular outlook. Half of this deck is a floating deck above a membrane roof.
A good size deck with a spectacular outlook. Half of this deck is a floating deck above a membrane roof.
Nothing like a brand ensuite.
Nothing like a brand ensuite.
A clean open plan design.
A clean open plan design.
A clean open plan design.
A clean open plan design.

Project description

This project was two new houses on a rear section. The site was tight and had to be heavily excavated, all new services run and a considerable amount of timber pole and waterproofed concrete block retaining. Once the ground works were completed and foundations poured, the houses flew together and look fantastic.

Last updated on 20-01-2026