Project

Overhead power line struck down

Project description

A moving truck had hit the overhead lines to 3x rental property.
Vector de-energized the remaining of the 3phase supply.
Vector advised according to Electrical rules, the power lines need to be lifted to a higher distance which is at 5.5meters minimum.
Re-did support system to elevate lines arranged vector to re-liven power supply.

Last updated on 20-01-2026