Here is a Job we did. Re-levelling, underpinning, packing piles, and replacing the rotten Floor. Two of us did this job while the boss was away, and it took us three weeks. Manual Digging 900mm underpin, cutting out the Rotten Floor and packing piles.
Last updated on 30-08-2025
Partner with Builderscrack
Get work