Re-levelling

rotten floor
rotten floor
repaced flooring
repaced flooring
concrete being delivered
concrete being delivered
here is the concrete poured
here is the concrete poured
these were 900mm underpin dug by hand and was under the deck. also shows steel to strengthen the concrete when its time to lift.
these were 900mm underpin dug by hand and was under the deck. also shows steel to strengthen the concrete when its time to lift.
here showa the underpin under the deck.
here showa the underpin under the deck.
here is the newe floor we put down, replacing the old Rotten one.
here is the newe floor we put down, replacing the old Rotten one.
here showas a pile being packed strapped down with stainless steel straps and fleched.
here showas a pile being packed strapped down with stainless steel straps and fleched.
stainless steel strapped to tie down the berra.
stainless steel strapped to tie down the berra.

Project description

Here is a Job we did. Re-levelling, underpinning, packing piles, and replacing the rotten Floor. Two of us did this job while the boss was away, and it took us three weeks. Manual Digging 900mm underpin, cutting out the Rotten Floor and packing piles.