Driveway extension

Brakeing out

Brakeing out

old concrete

old concrete

and

and

20 Ton

20 Ton

of fill

of fill

hole filled

hole filled

Finshed dig out

Finshed dig out

Project description

The Client wished to create an extension to their driveway and we were hired to do the dig out, the old concrete retaining structure was broken out and over 20 ton was moved to fill over 1.5 days