CCS is proud to present the Masefield Avenue Retaining Walls project, completed in 2024 for our clients. Our team of professionals successfully installed 12 x 6-7m deep Palisades with 450mm concrete piles spaced at 1240mm c/c, completing the Palisade wall. The steel cages were constructed as per engineers design, incorporating 8/HD20 vertical bars with HD10 spirals @ 300mm pitch and 75mm cover.
Following the installation of the palisade wall, a timber retaining wall and barrier reaching 3.7m in height was erected behind it. Despite limited digger access on-site, our team efficiently managed the logistics by barging in necessary equipment and materials. The project showcases our expertise in Residential Retaining and slope stabilization, highlighting our commitment to delivering high-quality solutions for our clients.