Published: 2 December 2018
Priority is to get waterproofing done as soon as possible (before Christmas) tiling would be an a great bonus. bath over shower renovation, tiling the wall around bath and shower and new floor.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fantastic experience with Kelvin and his team. We were needing a quick turn around before Christmas and we couldnt have asked for more. The tiling was completed ahead of schedule and I found the communication about the process and times exceptional. Thanks again!
Work carried out by the owner/operator
Reviewed on 10-01-2019
Partner with Builderscrack
Get work