Published: 5 December 2018
Possible waterproofing of bathroom floor etc to council standard, maybe toilet as it has a hand basin. All TBC following inspection on 11th. Bathroom 2500 X 3100 Toilet. 1050 X 2300. Still have to complete lining, after prelining inspection.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Bathroom waterproofing job was delayed, and when we were ready, Kelvin was able to complete the job without delay. Cost was less than quoted as we had changed the total floor area required. Work was carried out quickly, tidily and on time. Overall, pleased with the result, would use them again if required.
Work carried out by an employee of the company
Reviewed on 04-03-2019
Partner with Builderscrack
Get work