Review

New distribution bed for grey-water system.

Job image

Job description

Greywater Systems
Waitakere

Hi, during the routine maintenance of the septic & grey-water system it was pointed out that the disposal lines area was saturated. The guy that did the work suggested that I will need the distribution bed moved to a new area. The attached image was for an extension to the system in 2001. The land is on a bit of a slope as well.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Work carried out by the owner/operator
Reviewed on 17-12-2018

Tradesperson reply
"Thanks pero"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo