Remove old tiles, prep surface, reticle using tiles as pictured. Side 1 - Hob side is full height counter to ceiling behind range hood. Side two is two rows of tile under windows as possible.
#1 | Tradie 1 |
|
22 jobs | No longer in contact |
#2 | Tradie 2 |
|
180 jobs | No longer in contact |
#3 | Tradie 3 |
|
19 jobs | No longer in contact |
#4 | Tradie 4 |
|
16 jobs | No longer in contact |
Partner with Builderscrack
Get work