Published on 30 November 2016
- Remove current tiles on walls and strip everything back to the framework from floor to ceiling (shower only not whole bathroom). - Waterproof shower floor and walls - lay tiles (floor, wall, ceiling) and install drain - re install shower door and screen (glass) please note: - the current design has the barriers below the shower door and screen. I would like to leave those away for the new shower and rather have it even with the bathroom floor. As is currently the shower floor would lower from the outsides to the centrally located drain to allow the water to run off. - new tiles are just tiles - no fancy mosaic between tiles as is now
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Steve did a great job and made life easy for us as he communicated straight with our tenants regarding access to the property etc. Highly recommended.
Work carried out by the owner/operator
Reviewed on 7 April 2017
Partner with Builderscrack
Get work