Published on 9 September 2016
tiling floor ,except shower footprint, and some wall. total 4.5 sq. metres. after 28th September. sooner the better. seems straight forward , wooden floor, old vinyl removed already,skill needed for curved shower footprint.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
very good quality work , communication was exceptional for a tradesman ,I'm probably going to hire again for another tiling job. workmanship was probably 5/5 , except that I am reluctant to give a perfect score to anyone. that's just me.
Work carried out by the owner/operator
Reviewed on 5 October 2016
Tradesperson reply
"Thanks alot.
We love to do more work for you guys.
Enjoy your new bathroom an all the best.
Cheers
Alasimi Labana (Jimmy)"
Partner with Builderscrack
Get work