Published: 7 February 2019
Floor levelling and then tiled. It was a wet room and we are making into a standard bathroom.plumber installing a new shower box and vanity
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Kelvin was excellent to deal with and he did the job in the time frame needed. The job looks great.
Work carried out by the owner & subcontractors
Reviewed on 26-02-2019
Partner with Builderscrack
Get work